dukwat
Actualités de Kumba - Kumba iii
  • Il y'a un an
    #Marché_lancé
    #Montant_prévu: 245 000 000 FCFA
    Construction d'une salle de ban ljet dans la commune de k mba iii
  • Il y'a un an
    #Contract_launching
    #Amount_to_spend: 23 000 000 CFA Francs
    Construction of five cul verts in the kumba iii municipality (through the emergency procedure)
  • Il y'a un an
    #Contract_launching
    #Amount_to_spend: 19 350 000 CFA Francs
    Rehabilitation of a water point at mambanda native in kumba iii council
  • Il y'a un an
    #Contract_launching
    #Amount_to_spend: 20 000 000 CFA Francs
    Construction of a block of two wards at district medical center ntam in the kumba 111 subdivision, s.w.r (through the emergency procedure)
  • Il y'a 2 ans
    #Contract_launching
    #Amount_to_spend: 32 000 000 CFA Francs
    Construction of a professional center in mambanda in the kumba iii area (through the emergency procedure)
  • Il y'a 2 ans
    #Contract_launching
    #Amount_to_spend: 15 100 000 CFA Francs
    Rehabilitation of a block of two classrooms at government school tancha. (through the emergency procedure)
  • Il y'a 2 ans
    #Contract_launching
    #Amount_to_spend: 10 000 000 CFA Francs
    Construction of a modern poultry at the council (through the emergency procedure)
  • Il y'a 2 ans
    #Contract_launching
    #Amount_to_spend: 20 000 000 CFA Francs
    Supply of medical equipment to integrated health center barombi and district medical center ntam
  • Il y'a 2 ans
    #Contract_launching
    #Amount_to_spend: 100 000 000 CFA Francs
    Purchase of one tipper truck at kumba iii council
  • «
  • 1
  • »
Contacts
  • BP: 2034 Yaoundé CMR
  • info@dukwat.com
Suivez nous
  • dukwat
  • dukwat
Liens
  • A propos
  • Conditions d'utilisation
Copyright © 2025 - Dukwat - Tous droits reservés